These are some photos documenting the removal of the dam on Brookside Creek on the Hoy property. Click on any image to see a larger version.
![]() |
This photo was taken from on top of the earthen dam at the downstream end of the pond. |
![]() |
The outlet of the culvert through the dam. Through this culvert passed the entire flow of Brookside Creek at this point. |
![]() |
Before the backhoe went to work; a good part of the pond had already been drained mechanically via the white drainpipe. The view is on top of the dam on the Hoy property, looking upstream. |
![]() |
The backhoe has been digging from the downstream side. This is just before the dam is breached. |
![]() |
It's gone. |
![]() |
The new stream channel is being dug. |
![]() |
This is the old pond, mostly emptied, with a newly formed Brookside Creek meandering through the mud. |
![]() |
The new stream channel, still dry. |
![]() |
Raymond helping Kevin drive the backhoe. |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Dredging a new pond, just upstream of the log weir. |
The bulk of the heavy work is done; Brookside Creek flows freely through its new channel.